This is the new bridge across the Churchill river that will eventually link Goose Bay to Cartwright via a long road. The construction is very hard and is taking longer than planned.
Canon EOS 5D Mark II, f/6.3 @ 200 mm, 1/1250, ISO 800, No Flash
Category:
Subcategory:
Subcategory Detail:
Keywords:
© Al Kay